Turkiye Jobs 2026: Injection Moulding Setter & Plastic Mould Maintenance Technician Vacancies

Turkiye Jobs 2026: Injection Moulding Setter & Plastic Mould Maintenance Technician Vacancies

Turkiye Jobs 2026: Injection Moulding Setter & Plastic Mould Maintenance Technician Vacancies

Arman Consultants has announced job openings in Gaziantep, Turkiye (Turkey), for experienced professionals in plastic injection moulding and mould maintenance. A total of 10 vacancies are listed across two technical positions.

Candidates with at least five years of relevant experience in plastic injection moulding, machine setup, mould changeover, mould repair and preventive maintenance can apply.


Available Positions

1. Injection Moulding Setter / Process Technician

Vacancies: 5

Key Responsibilities and Skills:

  • Injection moulding machine setup.
  • Mould changeover and adjustments.
  • PP (polypropylene) material processing.
  • Multi-cavity mould operation.
  • Hot runner systems and troubleshooting.

2. Plastic Injection Mould Maintenance Technician

Vacancies: 5

Key Responsibilities and Skills:

  • Mould repair and maintenance.
  • Mould dismantling and fitting.
  • Hot runner system maintenance.
  • Reading and understanding technical drawings.
  • Preventive maintenance and troubleshooting.

Salary and Benefits

The job details mention the following benefits:

  • Company-provided accommodation.
  • Company-provided transportation.
  • Food or food allowance provided by the company.
  • Medical facilities provided by the company.
  • Eight-hour duty plus overtime.

Salary: The monthly salary is not specified. Candidates should confirm the salary, overtime rate, contract duration, insurance and other employment terms directly with Arman Consultants.


How to Apply 

Interested candidates Send CV To Email: armaan@armanconsultants.com

Telephone: +91 22 46063883

Mobile: +91 7506831219 / 89766 32049


Disclaimer: Read the ad to know more about the vacancies and the qualifications / Experience reqd. | Read the Ad carefully before you apply.We are a job information platform and are not directly involved in the recruitment or selection process. While we strive to share only genuine opportunities, we strongly advise all candidates to thoroughly verify the recruiting agency/license/employer before accepting any offer or making any payment.

GULF JOBS ALERT Latest Gulf Jobs Daily! FOLLOW CHANNEL โ†—